Construction of Systems for Biological and Chemical-Physical Treatment of Industrial Wastewaters

Right after the planning of your wastewater treatment system which goes along with detailed analysis, various approval procedures and preliminary investigation of all relevant parameters we now proceed with the construction of the plant.

Project Management and Portfolio

As an expert in wastewater treatment, we offer our customers full project management for the construction of the plant including the respective periphery such as pumps, fittings, measurement and control technology. Due to our customers‘ high demands for quality certain key components for our wastewater treatment are made in Germany and match the highest quality aspiration.

The modular structure of the system components allows delivering them ready to connect to the construction site. Our experienced site manager and technicians manage all required disciplines including piping and electrical installation as well as the assembly of the aggregates.

Construction of Wastewater Treatment Systems – Software Development and Panel Building

A data driven operation of the plant simplifies the usability and shows optimization potential. Our team in Dresden is specialized on the software development with respect to the programming of your plant control and automation system. Furthermore, we assemble the switch cabinets. Installation, wiring, electrical connection and testing is also done by our colleagues at site.

Start-Up and Process Optimization of Your Wastewater Treatment System

Oftentimes the equipment for wastewater treatment and the commissioning of new productions start simultaneously. During this time the DAS Environmental Experts of specialists in chemistry, biology and engineering provide the basis for an optimum production start. The system is adjusted to your individual process parameters.

DAS wastewater treatment systems provide you with the following benefits:

  • Space efficient design
  • Fast installation
  • Effective and energy saving aeration
  • High flexibility regarding fluctuation of load
  • Automated process control
  • Low maintenance effort
  • Can be combined with all common treatment technologies

Fields of Application:

  • New constructions
  • System upgrades and expansions
  • Equipment of plant segments
  • Renovation of existing plant

Project Management for the Construction of Wastewater Treatment Plants

DAS Environmental Expert is specialized on the planning and turnkey construction of customized wastewater treatment plants, no matter if a new construction, a system expansion or modernization is required. Our experienced project managers for wastewater technology ensure a timely and quality-compliant project management.

We support you with approval procedures, organize your construction site as general contractor and coordinate the trades until the final handover of the project. We always keep an eye on the budget while you can concentrate on your core business.

Your Advantages:

  • Engineering, delivery and realization from a single source
  • Optimum coordination of all components
  • Best design from overall solution down to the smallest detail
  • Fast, easy and uncomplicated handling and execution
  • Minimum number of interfaces
  • Import, customs and invoicing from a single source
  • Only one single contact for warranty and service
  • Minimum effort for spare part acquisition
  • Turnkey hand-over
  • Wide service portfolio (laboratory, maintenance)

Production and Construction of Your Wastewater Treatment System

As a German company headquartered in Dresden with worldwide subsidiaries we can flexibly adjust system production to your planned location, without you having to miss out on German know-how and quality.

DAS facilities are in Germany and worldwide being close to customer sites. System components such as pumps, fittings, measurement and control technology are provided by leading suppliers being quality leaders in their branch. Due to our customers ‘high demands for quality, DAS Environmental Expert manufactures certain key components for its wastewater treatment at its headquarters in Germany. This includes the individual software development and the panel building. The modular structure of the system components allows delivering them ready to connect to the construction site. Pre-mounting container modules at our own factory not only save time in construction, but also unnecessary costs when exporting them to different countries.

Installation of Your Wastewater Treatment System

Our experienced site managers and technicians manage the building of the wastewater treatment plant in cooperation with all required trades. This includes:

  • Dismantling of existing plants (if necessary)
  • Pipe installation in stainless steel and/or plastic
  • Electrical installation
  • Installation of aggregates
  • Provision of assembly equipment
  • Testing of the installed system (density control, weld inspection)
  • Panel position and connection
  • Cabling of all components
  • Testing of all electrical components

Start-Up and Process Optimization of Your Wastewater Treatment System

Oftentimes the equipment for wastewater treatment and the commissioning of new productions start simultaneously. During this time the DAS Environmental Expert team of specialists in chemistry, biology and engineering provide the basis for an optimum production start. After the start-up, the wastewater is analyzed in our laboratory with regards to the permissible parameters. If necessary, the plant performance will then be optimized accordingly. You will receive a detailed technical documentation of the system. We instruct your operating personnel in the operation of the wastewater system and will continue to assist you after handover.

Due to the high quality of DAS Environmental Expert’s technology the wastewater systems usually stay in operation for many years. During this time the composition of the inflowing wastewater or the requirements for limit values might change. A renewed analysis of all aggregates and stages of the treatment process as well as training of the plant’s personnel can achieve reductions in the double-digit percentage range.